Atakoy A Plus Mall
HVAC system, plumbing and fire installations were made as the design & build of the AVM.
Project introduction
- Year 2010
- Total Construction Area 80.000 m²
HVAC system, plumbing and fire installations were made as the design & build of the AVM.